Proprietary software by Ionio

Built for discrete manufacturing

Field notes on quoting.

UPFRONTTIME TO LIVESPREADSHEETPLATFORMIN-HOUSE BUILDCONFIGURED

Buying

Quoting software for manufacturers, an honest buyer's guide

The spreadsheet, the platform, the in-house build and the configured system, compared on cost, time to live and fit, with the vendors named.

JUL 24, 2026 · 9 MIN READ

10 WORKING DAYS0.5 HR2.0 HR1.0 HR0.5 HRDAY 1DAY 10WAITING

Process

How to cut RFQ response time from 10 days to 1

Where the 10 days on a quote actually go, why hand-offs cause most of them, and what changes commercially once the answer comes back the same day.

JUL 21, 2026 · 8 MIN READ

GEOMETRYPROCESS MODELSTANDARD RATESSHOULD-COSTCLOSED JOBSCLOSEST MATCHYOUR ACTUALSEARNED PRICEIN THEORYON YOUR FLOOR

Point of view

CAD to cost, or pricing from job history

Geometry-first tools estimate what a part should cost in theory. History-first pricing starts from what it did cost on your machines, and compounds.

JUL 17, 2026 · 8 MIN READ

OP-10 ROTARY4.6 SEC · $0.160OP-20 WASH1.8 SEC · $0.028OP-30 GRIND3.2 SEC · $0.078OP-40 HONE5.1 SEC · $0.135OP-50 CN$0.110OP-60 ZNNI$0.090OP-70 QA$0.019OP-50 AND OP-60 LEAVE THE BUILDINGINSIDE

Estimating

How to quote a machined part, line by line

A complete build-up on one turned part, bar stock to sell price. Material, routing, cycle and setup, tooling, outside processing and margin, line by line.

JUL 14, 2026 · 9 MIN READ

$ / PCTRIAL RUNMIN LOTFULL LOADPRODUCTION RATELOT SIZE

Estimating

How to price outside processing without guessing

Provisional plating and heat treat numbers quietly eat margin. Minimum lots, source approval and getting supplier quotes in before the price is set.

JUL 10, 2026 · 8 MIN READ

ONE BURDENED HOURMACHINESPACEMAINTTOOLSOPERATOROHUTILIZATIONDIVIDED BY REAL CUTTING HOURS, NOT HOPED FOR ONES

Estimating

What a burdened rate actually includes

What belongs inside a burdened rate, what quietly gets left out, and how an understated rate loses money invisibly across a multi-year program.

JUL 07, 2026 · 7 MIN READ

TODAY120 IN40 QUOTED8 WONSAME DAY120 IN120 QUOTED36 WON

Point of view

The real cost of a quote your team never sent

No report carries a line for the contract that was never close enough to lose. The throughput arithmetic of the 80 requests that quietly expire.

JUL 03, 2026 · 8 MIN READ

THE SHORTLIST FORMSDAY 1DAY 10STILL ARRIVING

Point of view

Why your quote win rate has little to do with your price

Buyers assemble the shortlist with the answers in hand, so arrival order shapes the decision before price is compared. Speed moves win rate first.

JUN 26, 2026 · 8 MIN READ

6 FILES IN THE PACKAGEPRINTMODELTERMSQUALITYWORKBOOKSCHEDULETHE PART IS IN ONE FILE. THE DEAL IS IN THE OTHERS.

Process

How to read an RFQ package before you price it

What to pull from the prints, the specs and the commercial terms in the first 20 minutes, and the 3 items that most often become unpriced risk.

JUN 19, 2026 · 8 MIN READ

MEASURECHANGE NOTHINGREMOVE HAND-OFFSONE SITTINGPRICE FROM HISTORYKEEPS COMPOUNDINGWEEK 1WEEK 5WEEK 9WEEK 12

Process

A 90 day plan to halve your quoting time

Weeks 1 to 4 measure the current process honestly, weeks 5 to 8 remove the hand-offs, weeks 9 to 12 price from history. A plan a GM can actually run.

JUN 12, 2026 · 9 MIN READ