The quoting glossary.
B
Bill of materialsThe list of every material, component and consumable a part or assembly needs, with quantities, that a quote and a build both hang their costs from.BilletSolid stock a part is machined from, and shorthand for the make-from decision that sets both the material line and the machining hours before any cutting starts.Burdened rateThe full cost of one hour on a work center, with machine ownership, space, power, maintenance, tooling, operator and overhead in it, at honest utilization.
C
F
FAIRA first article inspection report, the documented proof that every characteristic on the print was measured on a real part, and paperwork the quote pays for.First articleThe first piece produced by the real process, inspected in full to prove the routing, the tooling and the program before quantity runs.
P
PPAPThe production part approval process, the automotive gate proving your process makes the part to print at rate, and a cost the quote pays up front.PPAP Level 3The default PPAP submission level, the full evidence package with dimensional results, material certs, capability studies and control plans sent for approval.Price-downA contractual commitment that the piece price falls by an agreed percentage each year of a program, paid for out of productivity you have not found yet.
R
S
Setup timeThe hours a work center spends changing over to run a job, earning nothing, and a cost that belongs to the release quantity that triggered it.Should-costThe buyer's own model of what a part ought to cost, built from generic rates and clean geometry, and the number your quote gets argued against.
T
TakeoffThe pass where a print becomes a priced list, every operation, material and quantity the part will actually need, extracted before any number is committed.Tolerance stack-upThe way individual feature tolerances accumulate across a part or assembly, deciding whether pieces made to print still function together at the extremes.
W
WeldmentA fabricated assembly of cut, formed and machined pieces joined by welding, where the cost lives in labor, fit-up and distortion rather than in any single part.Work centerA machine or cell treated as its own costable unit, with its own rate, its own capacity and its own queue, rather than an anonymous piece of the floor.